This is a multi level and topic project
Hi everyone..i need help to publish linked projects in captivate 2019. To keep projects smaller i have opted to design separate sessions and then link the projects from the last slide and create a continued flow. Your help would be appreciated as this is a multi- branching project.
TIA , R
Why is the copy/paste project a problem? It means:
- Open both projects.
- Select the Filmstrip of one of the projects.
- Use CTRL-A to select all the slides in the filmstrip
- Use CTRL-C to copy them to the clipboard
- Switch to the other project
- Use CTRL-V to paste the slides.
That will be really seamless. If you use a link to the URL of the second project, you have to know that this will not be allowed in a LMS due to the SCORM rules. For a LMS you need to set up the links in the LSM, not in Captivate.
Hello,
I, too, am trying to link one project to another. Specifically, I want to link from the main course to a Glossary interaction and then allow the learner to go back to the main course where they left off. Has anyone done anything like that? Or is there a way to do this within the same project?
Thank you!
Hello,
I, too, am trying to link one project to another. Specifically, I want to link from the main course to a Glossary interaction and then allow the learner to go back to the main course where they left off. Has anyone done anything like that? Or is there a way to do this within the same project?
Thank you!
Hello,
I, too, am trying to link one project to another. Specifically, I want to link from the main course to a Glossary interaction and then allow the learner to go back to the main course where they left off. Has anyone done anything like that? Or is there a way to do this within the same project?
Thank you!
You must be logged in to post a comment.